Ag-leader Yield Monitor 2000 Operators Manual User Manual Page 197

  • Download
  • Add to my manuals
  • Print
  • Page
    / 202
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 196
Yield Monitor 2000
Index
Ag Leader Technology
June 1997
10-1
A
Acre Calibration Number 4-24
Acre Counting
Operation 4-23
Setting Stop Height 2-31
Site Verification 5-16
Acres
Adjusting Field 4-25
Adjusting Load 4-24
Displaying 4-17
Displaying Acres/Hour 4-17
Actual Load Weights
Entering 3-14
Setting to Zero 3-17
Ag Leader Technology-Fax Number 1-2
Ag Leader Technology-Mailing Address 1-2
Ag Leader Technology-Phone Number 1-2
AL2000 4-34
Alarm Volume 4-2
Application Rate Mapping
Monitor Setup 5-4
Recording Application Rate Data 5-4
Application Rate Monitor Program Chip
Description 5-9
Area Count Light 4-23
Area Count Switch 4-23
Arrow Keys 4-3
ATV Battery Power Cable
Description 5-6
Automatic Moisture Setting 2-21
Average Moisture, Displaying 4-15
Average Yield, Displaying 4-15
B
Backup Memory
Definition 4-28
Box Calibration Number, Setting 2-15
Buildup on Moisture Sensor 2-21, 3-9, 4-22
Bushels
Displaying 4-16
Dry 4-16
Dry, Calculating 7-2
Wet 4-16
Bushels, Flow (bu/hr) 4-17
C
C Numbers
Copying 4-26
Initial Setting 2-23
C Numbers 3-11
Cable Installation Kit
Description 5-9
Cable Pin-Outs 7-10
Calibrating Distance
Clearing Feet Out of the Load 3-4
Procedure 3-2
Calibrating for Vibration (C1)
Procedure 3-6
Calibrating Grain Weight
C Numbers 3-11
Cal Errors 3-15
Cal Lbs Now? 3-15
Calibration Loads, Definition 3-12
Harvesting Calibration Loads 3-13
Procedure 3-12
Recalibrating the Monitor 3-17
Vary Grain Flow Rate 3-12
Calibrating Moisture
Procedure 3-8
Calibrating Temperature
Procedure 3-5
Calibration Grain Weight
Entering Actual Load Weights 3-14
Calibration Loads
Defintion 3-12
Ceiling Mount Bracket
Description 5-5
Changing Data Load 4-12
Changing Fields 4-11
Changing Loads 4-11
Changing Number of Rows 4-19
Changing Row Space 4-20
Changing the Program Chip
Checking the New Chip 4-70
Procedure 4-68
What the Chip Does 4-68
Checking Data Accuracy - End of Season
Acres 4-66
Calibration 4-64
Field and Load Names 4-66
Grain Type 4-66
Moisture 4-65
Checking Hours of Logging Time on Memory Card 4-42
Checking Resistance Readings
Flow Sensor 7-10
Header Height Sensor 7-11
Chip
Application Rate Program 5-9
Changing the Chip 4-68
Checking the New Chip 4-70
What the Chip Does 4-68
Clearing All Fields 4-32
Clearing Loads From Memory 4-31
Connecting a GPS Receiver to a Monitor
Powering GPS through Monitor’s 9-Pin Port 4-45, 7-10
Connecting the Monitor to the PC
Windows 3.1 4-49
Windows 95 4-57
Controller Tee Adapter
Hiniker, Description 5-7
Raven, Description 5-7
Rawson, Description 5-6
Page view 196

Comments to this Manuals

No comments